Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Student Hostel at Nanyang Technological University of Singapore (PPVC)

Details

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 1 Block of 11-Sty & 3 Block of 13-Sty Student Hostel Development & 1 Block of 4-Sty MSCP with Ancillary Facilities

Project Highlights: 3rd PPVC project in Singapore and 2nd largest in 2015. Up to 25% Manpower Reduction & 40% improvement in Productivity. Redesign of Structure to PPVC Modules. Green Mark Project

Project Duration: Jun 2015 to Jun 2017

Location: Nanyang Crescent, Singapore

Challenges:
  • Project was converted to a design and build contract where Zheng Keng, together with the team of consultants have to re-design the development from conventional reinforced concrete structure to a modular system for PPVC.
  • Tight timeline of 20 months to complete the re-design, re-submission to authorities and construction.
  • Good management skills required to coordinate client’s, consultants’ and sub-contractors’ inputs and consensus on final PPVC design was obtained within five months. Design cannot be changed upon manufacturing of the PPVC modules.
  • Crucial to strike a balance between the PPVC modules’ hoisting/installation efficiency and the cost of site operations. Increasing the crane numbers and capacity increases efficiency but also operation cost.
  • Importing of PPVC modules from China presented logistical challenges. Factors like shipping costs and fitting yard capacity affect the selection of a suitable module size.
  • Proper manpower planning and scheduling required in order to complete project on time as the PPVC production and installation took place in three different locations (overseas, local fitting yard and actual site).
  • Special arrangements required for ITA & REs/RTOs to inspect the PPVC structure periodically at the production factory in China before delivery to site.
panaroma
_DSC9066
_DSC8911
_DSC8852
_DSC8633
_DSC8603
_DSC8434
_DSC8269
DCIM100MEDIADJI_0008.JPG
DCIM100MEDIADJI_0001.JPG
_DSC9493
_DSC9478
_DSC9472
_DSC9304
_DSC9144
_DSC9106

Related Posts

Juying Secondary School

Juying Secondary School

Client: Ministry of Education

Project Brief: Proposed Prime Upgrading to Existing Juying Secondary School Involving a New Erection of 1 Block of 4-Storey Administration Buildings, 1 Block of 4-Storey Classrooms, New Multi-Purpose Hall and a Block of 2-Storey Indoor Sports Hall

Project Duration: Dec 2009 to Jun 2012

Fern Green Primary School

Fern Green Primary School

Client: Ministry of Education

Project Brief: Proposed Erection of A New Primary School At Fernvale Link/Fernvale Street

Project Duration: Jul 2016 to Oct 2017

Bendemeer Project Ministry of Manpower

Bendemeer Project Ministry of Manpower

Client: Ministry of Manpower

Project Brief: Proposed Bendemeer Project (Main Contract) for Ministry of Manpower, Singapore

Project Duration: Dec 2010 to May 2012

Mayflower Secondary School

Mayflower Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations Works to Mayflower Secondary School Comprising 1 Block of 2-Sty Building, 1 Block of 3-Sty Building and 5 Blocks of 4-Sty Building and other Ancillary Buildings

Project Duration: Jun 2003 to Aug 2005