Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Student Hostel at Nanyang Technological University of Singapore (PPVC)

Details

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 1 Block of 11-Sty & 3 Block of 13-Sty Student Hostel Development & 1 Block of 4-Sty MSCP with Ancillary Facilities

Project Highlights: 3rd PPVC project in Singapore and 2nd largest in 2015. Up to 25% Manpower Reduction & 40% improvement in Productivity. Redesign of Structure to PPVC Modules. Green Mark Project

Project Duration: Jun 2015 to Jun 2017

Location: Nanyang Crescent, Singapore

Challenges:
  • Project was converted to a design and build contract where Zheng Keng, together with the team of consultants have to re-design the development from conventional reinforced concrete structure to a modular system for PPVC.
  • Tight timeline of 20 months to complete the re-design, re-submission to authorities and construction.
  • Good management skills required to coordinate client’s, consultants’ and sub-contractors’ inputs and consensus on final PPVC design was obtained within five months. Design cannot be changed upon manufacturing of the PPVC modules.
  • Crucial to strike a balance between the PPVC modules’ hoisting/installation efficiency and the cost of site operations. Increasing the crane numbers and capacity increases efficiency but also operation cost.
  • Importing of PPVC modules from China presented logistical challenges. Factors like shipping costs and fitting yard capacity affect the selection of a suitable module size.
  • Proper manpower planning and scheduling required in order to complete project on time as the PPVC production and installation took place in three different locations (overseas, local fitting yard and actual site).
  • Special arrangements required for ITA & REs/RTOs to inspect the PPVC structure periodically at the production factory in China before delivery to site.
panaroma
_DSC9066
_DSC8911
_DSC8852
_DSC8633
_DSC8603
_DSC8434
_DSC8269
DCIM100MEDIADJI_0008.JPG
DCIM100MEDIADJI_0001.JPG
_DSC9493
_DSC9478
_DSC9472
_DSC9304
_DSC9144
_DSC9106

Related Posts

Jelapang Nursing Home (Ongoing)

Jelapang Nursing Home (Ongoing)

Client: Land Transport Authority

Project Brief: Proposed Multi-Storey Sengkang West Bus Depot

Marsiling Community Club (Ongoing)

Marsiling Community Club (Ongoing)

Client: Land Transport Authority

Project Brief: Proposed Multi-Storey Sengkang West Bus Depot

Jurong West Nursing Home

Jurong West Nursing Home

Client: Ministry of Health

Project Brief: Proposed Development of A 8-Storey Nursing Home at Jurong West Street 52, Singapore

Project Duration: 26 December to 8 January 2020

Crest Secondary School

Crest Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alteration to an existing Secondary School for the Proposed Specialized School

Project Duration: Dec 2011 to Jan 2013