Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Student Hostel at Nanyang Technological University of Singapore

Details

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 2 Blocks of 7-Storey and 4 Blocks of 6-Storey Student Hostel with Basement Carpark and Ancillary Facilities

Project Duration: Jan 2013 to Jun 2014

Project Highlights: Full Precast Structure System Used.

Awards: Platinum Green Mark

Location: Nanyang Crescent, Singapore

Challenges
  1. Greenmark Platinum Building
  2. Short 17 months construction period
  3. Construction of building on sloping terrain.
  4. Full precast structure system required just in time delivery and installation to prevent site congestion
  5. Construction of ABC water pond below building blocks
  6. Construction of Boardwalk and Gazebo above ABC water pond
  7. Fair face concrete surface to all external wall and columns
  8. Construction of New 2000mm wide Box Drain along existing Nanyang Crescent Road.
img-projects-NTU-01-b
img-projects-NTU-06-b
img-projects-NTU-05-b
img-projects-NTU-04-b
img-projects-NTU-03-b
img-projects-NTU-02-b
Blk 1A from Lily pond
Pond Between Blk 1 & Blk 5 (3)
MPH
Court Yard Blk 2B & 3
Broadwalk (6)
Blk 5 (3)

Related Posts

Geylang Methodist School (Secondary)

Geylang Methodist School (Secondary)

Client: Ministry of Education

Project Brief: Proposed Alterations and Additions to Geylang Methodist Secondary School

Project Duration: Sep 2005 to May 2007

Mayflower Secondary School

Mayflower Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations Works to Mayflower Secondary School Comprising 1 Block of 2-Sty Building, 1 Block of 3-Sty Building and 5 Blocks of 4-Sty Building and other Ancillary Buildings

Project Duration: Jun 2003 to Aug 2005

Building and Electrical Works at Jurong West HDB Neighbourhood

Building and Electrical Works at Jurong West HDB Neighbourhood

Client: Housing Development Board

Project Brief: Building and Electrical Works at Jurong West Neighbourhood 6 Contract 23 (Total 507 Dwelling Units)

Project Duration: Jun 1998 to Sep 2000

Nanyang Girls’ High School

Nanyang Girls’ High School

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016