Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Crest Secondary School

Details

Client: Ministry of Education

Project Brief: Proposed Additions and Alteration to an existing Secondary School for the Proposed Specialized School

Project Duration: Dec 2011 to Jan 2013

Awards: Platinum Green Mark

Conquas Score: 91.7

Location: 561 Jurong East Street 24, Singapore 609561

Challenges
  1. Greenmark Platinum Building
  2. Close Proximity to Sensitive HDB Residential and schools Area
  3. Construction of CBP Wall at middle of 11m slope
  4. Short 12 months contract period
  5. To maintain the CD shelter within the site in operational for FSSD during construction stage
  6. Construction of 42m MPH beams and slab across existing CD shelter
img-projects-Crest-SS-08-b
img-projects-Crest-SS-07-b
img-projects-Crest-SS-06-b
img-projects-Crest-SS-05-b
img-projects-Crest-SS-04-b
img-projects-Crest-SS-03-b
img-projects-Crest-SS-02-b
img-projects-Crest-SS-01-b

Related Posts

Delta Senior School

Delta Senior School

Client: Association for Persons with Special Needs

Project Brief: Proposed Delta Senior School Development

Project Duration: Oct 2010 to Feb 2012

Tampines East Community Centre

Tampines East Community Centre

Client: People’s Association

Project Brief: Proposed Additions and Alterations to Existing Tampines East Community Club and A New Extension Block Using Design and Build Procurement Method at MK 28 Lot 04577V, 10 Tampines Street 23, Singapore 529341

Project Duration: 3 April 2018 to 3 December 2019

Student Hostel at Nanyang Technological University of Singapore

Student Hostel at Nanyang Technological University of Singapore

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 2 Blocks of 7-Storey and 4 Blocks of 6-Storey Student Hostel with Basement Carpark and Ancillary Facilities

Project Duration: Jan 2013 to Jun 2014

Mayflower Secondary School

Mayflower Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations Works to Mayflower Secondary School Comprising 1 Block of 2-Sty Building, 1 Block of 3-Sty Building and 5 Blocks of 4-Sty Building and other Ancillary Buildings

Project Duration: Jun 2003 to Aug 2005