Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Geylang Methodist School (Secondary)

Details

Client: Ministry of Education

Project Brief: Proposed Alterations and Additions to Geylang Methodist Secondary School

Project Duration: Sep 2005 to May 2007

Location: No 2 Geylang East Central, Singapore 389705

Challenges
  1. Shortage of sand and aggregate supply due to sand export restriction policy by Indonesia government
  2. Protection of a live 66KVA cable within the site during piling and sub-structure stage.
  3. Relocation of bus stop along main road required coordination with various authorities
  4. Close Proximity to Sensitive HDB Residential Area
img-projects-GeylangMethodist-04-b
img-projects-GeylangMethodist-01-b
img-projects-GeylangMethodist-02-b
img-projects-GeylangMethodist-03-b
img-projects-GeylangMethodist-05-b
img-projects-GeylangMethodist-06-b
img-projects-GeylangMethodist-07-b
img-projects-GeylangMethodist-08-b

Related Posts

Bendemeer Project Ministry of Manpower

Bendemeer Project Ministry of Manpower

Client: Ministry of Manpower

Project Brief: Proposed Bendemeer Project (Main Contract) for Ministry of Manpower, Singapore

Project Duration: Dec 2010 to May 2012

Nanyang Girls’ High School

Nanyang Girls’ High School

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016

Crest Secondary School

Crest Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alteration to an existing Secondary School for the Proposed Specialized School

Project Duration: Dec 2011 to Jan 2013

Jurong West Nursing Home

Jurong West Nursing Home

Client: Ministry of Health

Project Brief: Proposed Development of A 8-Storey Nursing Home at Jurong West Street 52, Singapore

Project Duration: 26 December to 8 January 2020