Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Dunman Secondary School

Details

Client: Ministry of Education

Project Brief: Proposed Upgrading to Existing Dunman Secondary School

Project Duration: Jun 2008 to Jul 2009

Location: 21 Tampines Street 45, Singapore 529093

Challenges
  1. On site A&A and upgrading works required extensive Safety and environmental control to minimise disturbance to students
  2. Sharing of school and construction access required proper safety and traffic control.
  3. Close Proximity to Sensitive HDB Residential Area
img-projects-DunmanSS-06-b
img-projects-DunmanSS-01-b
img-projects-DunmanSS-02-b
img-projects-DunmanSS-03-b
img-projects-DunmanSS-04-b
img-projects-DunmanSS-05-b
img-projects-DunmanSS-07-b

Related Posts

Hong Kah Secondary School

Hong Kah Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations to Hong Kah Secondary School Involving the Erection of 3 Blocks of 2-4 Storey Buildings and Other Ancillary Buildings

Project Duration: Aug 2008 to Nov 2009

Student Hostel at Nanyang Technological University of Singapore (PPVC)

Student Hostel at Nanyang Technological University of Singapore (PPVC)

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 1 Block of 11-Sty & 3 Block of 13-Sty Student Hostel Development & 1 Block of 4-Sty MSCP with Ancillary Facilities

Project Duration: Jun 2015 to Jun 2017

Nanyang Girls’ High School

Nanyang Girls’ High School

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016

Ai Tong School

Ai Tong School

Client: Singapore Hokkien Huay Kuan

Project Brief: Proposed Upgrading Works to Existing Ai Tong School Comprising of 5-Storey Extension Building & New Erection of a Covered Transport Centre with a Playfield

Project Duration: Apr 2014 to Nov 2015