Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Hong Kah Secondary School

Details

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations to Hong Kah Secondary School Involving the Erection of 3 Blocks of 2-4 Storey Buildings and Other Ancillary Buildings

Project Duration: Aug 2008 to Nov 2009

Project Highlights: Use of Precast Staircase and Columns in Construction.

Awards: BCA Construction Excellence Award

Conquas Score: 91.8 (Highest Conquas Score in 2009 under Institutional Category)

Location: No 931 Jurong West Street 42, Singapore 649370

Challenges
  1. Close Proximity to Sensitive HDB residential area
  2. New bored piles clashed with existing piles during boring process.
  3. Bored piling works clashed with boulder stone and required intensive analysis from NUS Professor
  4. To maintain the CD shelter within the site in operational for FSSD during construction stage
img-projects-HongKahSS-02-b
img-projects-HongKahSS-01-b
img-projects-HongKahSS-03-b
img-projects-HongKahSS-04-b

Related Posts

Ai Tong School

Ai Tong School

Client: Singapore Hokkien Huay Kuan

Project Brief: Proposed Upgrading Works to Existing Ai Tong School Comprising of 5-Storey Extension Building & New Erection of a Covered Transport Centre with a Playfield

Project Duration: Apr 2014 to Nov 2015

Nanyang Girls’ High School

Nanyang Girls’ High School

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016

Geylang Methodist School (Secondary)

Geylang Methodist School (Secondary)

Client: Ministry of Education

Project Brief: Proposed Alterations and Additions to Geylang Methodist Secondary School

Project Duration: Sep 2005 to May 2007

Juying Secondary School

Juying Secondary School

Client: Ministry of Education

Project Brief: Proposed Prime Upgrading to Existing Juying Secondary School Involving a New Erection of 1 Block of 4-Storey Administration Buildings, 1 Block of 4-Storey Classrooms, New Multi-Purpose Hall and a Block of 2-Storey Indoor Sports Hall

Project Duration: Dec 2009 to Jun 2012