Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Hong Kah Secondary School

Details

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations to Hong Kah Secondary School Involving the Erection of 3 Blocks of 2-4 Storey Buildings and Other Ancillary Buildings

Project Duration: Aug 2008 to Nov 2009

Project Highlights: Use of Precast Staircase and Columns in Construction.

Awards: BCA Construction Excellence Award

Conquas Score: 91.8 (Highest Conquas Score in 2009 under Institutional Category)

Location: No 931 Jurong West Street 42, Singapore 649370

Challenges
  1. Close Proximity to Sensitive HDB residential area
  2. New bored piles clashed with existing piles during boring process.
  3. Bored piling works clashed with boulder stone and required intensive analysis from NUS Professor
  4. To maintain the CD shelter within the site in operational for FSSD during construction stage
img-projects-HongKahSS-02-b
img-projects-HongKahSS-01-b
img-projects-HongKahSS-03-b
img-projects-HongKahSS-04-b

Related Posts

Dunman Secondary School

Dunman Secondary School

Client: Ministry of Education

Project Brief: Proposed Upgrading to Existing Dunman Secondary School

Project Duration: Jun 2008 to Jul 2009

Delta Senior School

Delta Senior School

Client: Association for Persons with Special Needs

Project Brief: Proposed Delta Senior School Development

Project Duration: Oct 2010 to Feb 2012

Crest Secondary School

Crest Secondary School

Client: Ministry of Education

Project Brief: Proposed Additions and Alteration to an existing Secondary School for the Proposed Specialized School

Project Duration: Dec 2011 to Jan 2013

Nanyang Girls’ High School

Nanyang Girls’ High School

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016