Details
Client: Ministry of Education
Project Brief: Proposed Additions and Alterations to Hong Kah Secondary School Involving the Erection of 3 Blocks of 2-4 Storey Buildings and Other Ancillary Buildings
Project Duration: Aug 2008 to Nov 2009
Project Highlights: Use of Precast Staircase and Columns in Construction.
Awards: BCA Construction Excellence Award
Conquas Score: 91.8 (Highest Conquas Score in 2009 under Institutional Category)
Location: No 931 Jurong West Street 42, Singapore 649370
Challenges
- Close Proximity to Sensitive HDB residential area
- New bored piles clashed with existing piles during boring process.
- Bored piling works clashed with boulder stone and required intensive analysis from NUS Professor
- To maintain the CD shelter within the site in operational for FSSD during construction stage