Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Nanyang Girls’ High School

Details

Client: Nanyang Girls’ High School

Project Brief: Proposed Addition and Alteration to Existing Nanyang Girls’ High School Including Erection of 1 Block of Indoor Sports Hall and 1 Block of Performance Theatre with Basement Classrooms, Activity Hall and Roof Terrace

Project Duration: Dec 2014 to Aug 2016

Project Highlights: First 2-Storey Basement constructed for Schools. Green Mark Project.

Location: No.2 Linden Drive, Singapore

DCIM100MEDIADJI_0004.JPG
use for Main Page
PAC 1ST STY SPR 2
Linkway
ISH
img-projects-NanyangGirls-02-b
DSC_8056
DSC_8030
DSC_8022
DSC_8006
DSC_2396
DCIM100MEDIADJI_0042.JPG

Related Posts

Geylang Methodist School (Secondary)

Geylang Methodist School (Secondary)

Client: Ministry of Education

Project Brief: Proposed Alterations and Additions to Geylang Methodist Secondary School

Project Duration: Sep 2005 to May 2007

Yuying Secondary School

Yuying Secondary School

Client: Ministry of Education

Project Brief: Proposed Erection of A New 4-Storey Block and A&A Alterations to Existing Yuying Secondary School

Project Duration: Mar 2001 to Dec 2002

Student Hostel at Nanyang Technological University of Singapore

Student Hostel at Nanyang Technological University of Singapore

Client: Nanyang Technological University of Singapore

Project Brief: Proposed Erection of 2 Blocks of 7-Storey and 4 Blocks of 6-Storey Student Hostel with Basement Carpark and Ancillary Facilities

Project Duration: Jan 2013 to Jun 2014

Tampines Nursing Home

Tampines Nursing Home

Client: Ministry of Health

Project Brief: Design, Development and Build of The Proposed Development of A Nursing Home at Tampines Avenue 2, Singapore With Implementation of PPVC Technology and Contingency Works

Project Duration: 18 March 2019 to 17 September 2020