Zheng Keng
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

  • Home
  • About Us
    • Company Profile
    • Subsidiaries
    • Related Companies
      • ZK Developments
      • Saniton Ceramic
    • Our Commitments To Safety
  • Recognition
  • Portfolio
    • General Building
    • Sanitary & Plumbing
  • News & Insights
    • News
    • Company Happenings
  • Career
  • Contact Us
© Copyright 2017-2024
Zheng Keng
Engineering & Construction
Pte Ltd

Zheng Keng

Mayflower Secondary School

Details

Client: Ministry of Education

Project Brief: Proposed Additions and Alterations Works to Mayflower Secondary School Comprising 1 Block of 2-Sty Building, 1 Block of 3-Sty Building and 5 Blocks of 4-Sty Building and other Ancillary Buildings

Project Duration: Jun 2003 to Aug 2005

Location: 2 Ang Mo Kio Street 21, Singapore 569384

Challenges
  1. On site A&A and upgrading works required extensive Safety and environmental control to minimise disturbance to students.
  2. Protection, excavation and construction of retaining wall along 1000mm diameter live water pips running within the site.
  3. Close Proximity to Sensitive HDB Residential Area
img-projects-Mayflower-01-b
img-projects-Mayflower-03-b
img-projects-Mayflower-02-b
img-projects-Mayflower-04-b
img-projects-Mayflower-05-b

Related Posts

Tampines East Community Centre

Tampines East Community Centre

Client: People’s Association

Project Brief: Proposed Additions and Alterations to Existing Tampines East Community Club and A New Extension Block Using Design and Build Procurement Method at MK 28 Lot 04577V, 10 Tampines Street 23, Singapore 529341

Project Duration: 3 April 2018 to 3 December 2019

Jurong West Nursing Home

Jurong West Nursing Home

Client: Ministry of Health

Project Brief: Proposed Development of A 8-Storey Nursing Home at Jurong West Street 52, Singapore

Project Duration: 26 December to 8 January 2020

Tampines Nursing Home

Tampines Nursing Home

Client: Ministry of Health

Project Brief: Design, Development and Build of The Proposed Development of A Nursing Home at Tampines Avenue 2, Singapore With Implementation of PPVC Technology and Contingency Works

Project Duration: 18 March 2019 to 17 September 2020

Sengkang West Bus Depot (Ongoing)

Sengkang West Bus Depot (Ongoing)

Client: Land Transport Authority

Project Brief: Proposed Multi-Storey Sengkang West Bus Depot